NH-244 Highway – Package III (EPC Mode)
Construction and upgradation of 2-lane highway with paved shoulders on the Khellani–Kishtwar–Chattroo section of NH-244. The project involved execution in hilly and difficult terrain with strict quality and safety standards under EPC mode.
Location
Jammu & Kashmir (UT)
Length
12.870 km
Client
NHIDCL
Lukung – Chartse Road Project
Construction of single-lane and two-lane strategic road in Ladakh under EPC mode. The project was executed at high altitude with extreme weather conditions, supporting defence and regional connectivity.
Location
Ladakh (UT)
Length
36.57 kms
Client
BRO
Sumdo – Nidder – Thongo Road (PKG-I & PKG-II)
Execution of 60 km highway road to NHSL specifications in one of the most challenging mountainous terrains of Ladakh. Included earthwork, pavement layers, drainage, and protection works.
Location
Ladakh (UT)
Length
60.00 km
Client
BRO
Chaudhary Ranbir Singh University Building
Construction of an institutional building with RCC structure and allied works, executed with adherence to academic infrastructure norms and timelines.
Location
Jind, Haryana
Length
65,000 sq. ft.
Client
NBCC India Ltd
NH-244 Left-Over Work – Package III
Completion of left-over stretch of NH-244 including formation, paving, and finishing works under EPC mode, ensuring continuity and safety of the highway corridor.
Location
Kandni Village, Jammu & Kashmir (UT)
Length
4.037 km
Client
NHIDCL